The San Leandro, CA, McKinley Elementary School project of two Classroom Buildings was designed using a prefabricated panelized system. This project allowed the school to gain 12,400 square-feet of classroom space. ISE Structural Engineers provided structural engineering services, and the design team contained Wilson Architecture, Inc., WLC Architects, and builder Jeff Luchetti Construction, Inc.. The project closed in 2020.